Working with Potterton

Potterton Performa 24 boiler repair,
Diagnostics had been carried out, it was found the miro switch requited replacing. Supplied and fitted new miroswitch, heating and hot water was left fully funtional and restored back to it’s original state of operation.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

© Boiler Boiler Works
CyberChimps